Portfolio

Harry Creek Bridge

Installation of a bridge across “Harry Creek” for access to the Salmon restoration project. This restoration project is located on 5-Mile Creek and Bell Creek. This bridge had to be transported from Oakridge Oregon to Harry Creek, just north of Reedsport.

Seal Rock Water District

Installation of approximately 28,000 feet of water-main. Installed on Seal Rock Streets for Seal Rock Water District.

Fore Dune Beach Access

Beach Access Road through the Fore Dune. Located off of Goose Pasture road, south of Florence.

Road Realignment

Road realignment due to partial road-fill failure. National Forest Road.

Logging and Access Road Maintenance and Repair

Maintenance included rocking, grading, ditching, brushing. Repair includes culvert repair, sink hole repair, slide removal, hazard tree removal, etc.

Campsite/Park Remodel

A day-use park was modified into a group camp site.

Trail and Trail-Head Improvement

Trail and trail head were improved for increased use.

Private Bridge

Installed a private rail-road car bridge on concrete abutments.

Hebo Lake

Hebo Lake electrical improvement project. Project was completed by directional drilling and excavation to provide power to the park.